Real Commercial Roofing Projects Across the Phoenix Metro

Photos, scope of work, and warranty details from the commercial roofs we've actually restored, repaired, and replaced for Arizona property owners, HOA boards, and facility managers.

Freshly-finished bright white TRC silicone roof coating on Cold Beers & Cheeseburgers Scottsdale, York HVAC condensers on foam substrate with McDowell Mountains visible in the background
Restaurant / Sports Bar · Scottsdale, AZ · July 2026

8,755 SF Foam Roof Repair & Silicone Recoat — Cold Beers & Cheeseburgers, 116th & Shea

8,755 sq ft ArmorCoat AC100 base TRC white silicone top

A worn foam roof at the Cold Beers & Cheeseburgers on N 116th St in North Scottsdale — degreased, ArmorPutty-repaired at every crack and penetration, then a full 2-coat stack: AC100 elastomeric base plus TRC white silicone topcoat. Restaurant stayed open every day.

Aerial drone view of the completed 20,000 sq ft silicone-coated low-slope roof at Solterra Senior Living, 350 S Alma School Rd in Chandler AZ, showing bright white TRC 980 100% silicone coating running the length of the assisted-living community between the terracotta Spanish-tile pitched wings
Senior Living / Assisted Living · Chandler, AZ · July 2026

20,000 SF Silicone Recoat — Solterra Senior Living, Chandler

20,000 sq ft 2 coats TRC 980 100% silicone TRC 910 detail work 10-yr no-leak

A 20,000 sq ft silicone restoration on a 110-resident Chandler assisted-living community — TRC 910 at every drain, membrane repaired at every defect, HVAC field cleanly protected, and two full coats of TRC 980 100% silicone across every low-slope section. Zero disruption to residents.

Ground-level view of the completed 9,820 sq ft new spray polyurethane foam roof at 42 W Boxelder Pl in Chandler AZ finished bright white with two coats of ARMORCOAT AC100 elastomeric coating, rooftop HVAC unit and parapet wall detail visible against a clear Arizona sky
Industrial / Multi-tenant · Chandler, AZ · July 2026

9,820 SF Tear-Off & New Foam Roof — 42 W Boxelder Pl, Chandler

9,820 sq ft Full tear-off & rebuild 1" new SPF + AC100 10-yr no-leak

A full tear-off and new foam roof on a 1981-vintage Chandler industrial building — existing membrane stripped to the deck, ponding corrected with additional foam at the low areas, 1 inch of fresh SPF sprayed edge-to-edge with vertical parapet wraps, and two coats of ARMORCOAT AC100. Direct property-management contract.

Aerial drone view of the completed 16,600 sq ft new spray polyurethane foam roof at 116 S Industrial Dr in Tempe AZ finished bright white with two coats of ARMORCOAT AC100 elastomeric coating, palm shadows across the street and the industrial corridor of west Tempe visible below
Precision Manufacturing / Industrial · Tempe, AZ · July 2026

16,600 SF New Foam Roof & AC100 Recoat — 116 S Industrial Dr, Tempe

16,600 sq ft NEW foam roof (2 layers) 2 coats ARMORCOAT AC100 10-yr no-leak

A new 16,600 sq ft spray polyurethane foam roof over a scarified existing substrate on a Tempe precision-manufacturing facility — two fresh layers of SPF, every scupper and vent sealed with ArmorPutty, and two full coats of ARMORCOAT AC100. Production floor stayed open.

Aerial golden-hour view of the completed 10,000 sq ft MuleHide 100% Silicone roof at 7363 E Tierra Buena Ln in the Scottsdale Airpark, with rooftop HVAC units and the McDowell Mountains in the background
Industrial / Flex · Scottsdale Airpark, AZ · July 2026

10,000 SF MuleHide Silicone Recoat — 7363 E Tierra Buena Ln, Scottsdale Airpark

10,000 sq ft MuleHide 100% Silicone 89 SRI cool roof 10-yr no-leak

A silicone-over-silicone restoration on an aged 10,000 sq ft Scottsdale Airpark roof — MuleHide 115 Cleaner prep, every crack and bubble repaired with MuleHide silicone sealant, then a full MuleHide 100% Silicone topcoat. No tenant closures.

Aerial drone view of the three completed flex-industrial buildings at 2403, 2425 and 2525 W Huntington Dr in Tempe AZ — all finished bright white with two coats of ARMORCOAT AC100 over 42,000 sq ft of repaired spray polyurethane foam roof
Flex Industrial / Office Flex · Tempe, AZ · July 2026

42,000 SF Foam Repair & Recoat — 3 Buildings on Huntington Dr, Tempe

42,000 sq ft 3 buildings 2 coats ARMORCOAT AC100 5-yr no-leak

Three side-by-side flex-industrial buildings at 2403, 2425 and 2525 W Huntington Dr — 42,000 sq ft of spray polyurethane foam, all bubbles cut and re-filled, scuppers and drains re-sealed with ArmorPutty, and two coats of AC100 across all three roofs.

Aerial drone view of the completed Cold Beers & Cheeseburgers restaurant at 1026 S Gilbert Rd in Gilbert AZ with a freshly coated bright white ARMORCOAT AC100 TPO roof framed by the signature red-painted parapet caps
Restaurant / Sports Bar · Gilbert, AZ · July 2026

5,900 SF TPO Repair & Recoat — Cold Beers & Cheeseburgers, Gilbert Town Square

5,900 sq ft 2 coats ARMORCOAT AC100 Silicone at grease trap

A full TPO repair and recoat over the Cold Beers & Cheeseburgers on Gilbert Rd — ArmorPutty at every seam and detail, 2 coats of AC100 across the whole roof, and a targeted silicone coating around the kitchen grease trap. Zero closed shifts.

Aerial drone view of 39,000 sq ft foam roof at 7427 E Hampton Ave in Mesa AZ mid-application showing the bright white ARMORCOAT AC100 topcoat meeting the aged tan foam substrate in a single frame
Flex Industrial Park · Mesa, AZ · July 2026

39,000 SF Flex Industrial Foam Recoat — Superstition Springs Business Park

39,000 sq ft 2 coats ARMORCOAT AC100 10-yr No-Leak

A 39,000 sq ft foam roof recoat on this freeway-visible flex industrial building in Mesa's Superstition Springs Business Park — ArmorPutty crack repair, sealed scuppers & vents, and 2 coats of ARMORCOAT AC100. Four tenants stayed fully open.

Completed 27,000 sq ft polyurethane foam roof with 2 coats of ARMORCOAT AC100 white elastomeric at East Valley Jewish Community Center on N Alma School Rd in Chandler AZ, with childrens play-area shade sails visible on the west side
Community Center · Chandler, AZ · July 2026

27,000 SF Community Center Foam Restoration — East Valley JCC

27,000 sq ft ArmorPrime + ArmorPutty + AC100 Preschool stayed open

A full foam restoration on this busy Chandler community center — scrape, prime with ArmorPrime, repair bubbles & cracks with ArmorPutty, and 2 coats of ARMORCOAT AC100 — while the preschool and gym stayed fully open.

Completed ARMORCOAT AC100 foam roof recoat covering 155,000 sq ft at the AAA Insurance Arizona corporate headquarters in Glendale — orthographic drone view showing the full building footprint with bright white finished coating
Corporate HQ · Glendale, AZ · July 2026

155,000 SF Foam Roof Recoat — AAA Insurance HQ

155,000 sq ft ARMORCOAT AC100 10-yr No-Leak

The largest single roof in the Vanguard portfolio — 155,000 sq ft of foam recoated with 2 coats of ARMORCOAT AC100 across the AAA Insurance campus in Glendale in just 2 weeks, with a 10-year no-leak warranty.

Completed aerial view of the Aster at Mountain Vista multifamily community in east Mesa AZ showing all 11 buildings with finished polyurethane foam roofs coated in bright white ARMORCOAT AC100 — Superstition Mountains visible in the distance
Multifamily · Mesa, AZ · 2026

11-Building Foam Roof Community — Aster at Mountain Vista

11 buildings Polyurethane Foam + AC100 New Construction

A 12-month phased new-construction foam roof install for Ascent Multifamily Development across 11 buildings at the Aster at Mountain Vista community in east Mesa — polyurethane foam plus ARMORCOAT AC100.

Completed 29,500 sq ft foam roof restoration at 1860 W University Dr in Tempe AZ with 523 solar panels reinstalled over the fresh white acrylic-coated polyurethane foam substrate — drone aerial view of the finished project
Solar Restoration · Tempe, AZ · July 2026

523-Solar-Panel Removal + Foam Restoration — Tempe

29,500 sq ft 523 solar panels Foam + White Acrylic

Removed and reinstalled 523 solar panels while we scarified the existing foam, repaired the substrate, and applied fresh 1-inch polyurethane foam plus white acrylic on 29,500 sq ft at 1860 W University Dr, Tempe.

Completed drone aerial view of the finished 23,000 sq ft foam roof at Durus Industrial in Chandler AZ with the DURUS signage on the building visible from above — bright white ARMORCOAT AC100 finish covering the industrial facility
Industrial · Chandler, AZ · July 2026

Full Tear-Off + Truss Repair + Foam Roof — Durus Industrial

23,000 sq ft Tear-off + Foam + AC100 Structural Repair

A rare 3-scope commercial roof job in Chandler: tear-off down to wood decking, structural truss and decking repair, fresh polyurethane foam, and 2 coats of ARMORCOAT AC100 across 23,000 sq ft.

Completed foam roof at the Goodwill retail store on Bethany Home Rd in central Phoenix with the downtown Phoenix skyline visible in the background — bright white ARMORCOAT AC100 finish after the 40 foot by 190 foot tapered cricket drainage rebuild
Retail · Central Phoenix, AZ · 2026

Foam Roof + 40'×190' Tapered Crickets — Goodwill Bethany Home

Full drainage rebuild Tapered crickets Foam + AC100

We literally reshaped a flat roof with 40-foot by 190-foot tapered wood crickets, then applied fresh polyurethane foam and 2 coats of ARMORCOAT AC100 to solve chronic ponding at this Goodwill retail store.

Completed 32,000 sq ft ARMORCOAT AC100 foam roof recoat at the Food City grocery store on W Van Buren St in west Phoenix — bright white finished coating with refoamed parapet walls visible from above
Grocery Retail · West Phoenix, AZ · 2026

Parapet Refoam + 32,000 SF Foam Recoat — Food City

32,000 sq ft Parapet refoam + AC100 Retail open

Sun-damaged parapet walls refoamed, then 32,000 sq ft of foam roof recoated with 2 coats of ARMORCOAT AC100 at Food City on W Van Buren — the grocery store never closed and the loading dock stayed open.

Completed 15,000 sq ft foam-over-foam recover at Venue 8600 in North Scottsdale AZ with the McDowell Mountains visible in the backdrop — fresh polyurethane foam and ARMORCOAT AC100 white finish
HOA/POA · North Scottsdale, AZ · 2026

Foam-Over-Foam Recover — Venue 8600, North Scottsdale

15,000 sq ft ArmorShield 2500 + AC100 HOA/POA Board

A 15,000 sq ft foam-over-foam recover near Kierland — ArmorShield 2500 polyurethane foam plus 2 coats of ARMORCOAT AC100 for the Venue 8600 property owners association board.

Completed 60-mil Versico fully adhered TPO roof on a 38,000 sq ft industrial facility at 4002 W Wier Ave, South Phoenix, with the South Mountain skyline
Industrial · South Phoenix, AZ · July 2026

41,550 SF Versico TPO Industrial New Construction, South Phoenix

41,550 sq ft 60-mil Versico Fully Adhered TPO 20-yr NDL Warranty

A new multi-bay industrial facility at 4002 W Wier Ave, roofed with 60-mil Versico fully adhered TPO over Versico R26 poly iso with tapered polyiso for positive drainage — 14 days, zero deficiencies, 20-year Versico NDL warranty.

Completed 60-mil GAF TPO roof at Verde at Cooley Station retail center in Gilbert Arizona with HVAC package units, walk pads, and the mountain skyline
Retail Center · Gilbert, AZ · July 2026

GAF TPO New Construction — Verde at Cooley Station, Gilbert

16,200 sq ft 60-mil GAF Mechanically Fastened TPO 20-yr NDL Warranty

Building F at Verde at Cooley Station — 16,200 sq ft of 60-mil GAF mechanically fastened TPO over R25 poly iso, with tapered crickets, manufactured pipe cones, and walk pads. 10 days, 20-year GAF NDL warranty.

Completed AC100 roof coating on the historic 1962 barrel-vault domed First Church of Christ, Scientist landmark in Scottsdale Arizona
Historic Church · Scottsdale, AZ · July 2026

Historic Church Roof Restoration — First Church of Christ, Scientist

1962 Landmark Foam Repair + AC100 5-yr No-Leak

The 1962 T.S. Montgomery-designed First Church of Christ, Scientist on the Scottsdale Historic Register — spray foam repair with Armor Shield 2500 and a two-coat AC100 elastomeric topcoat over the signature barrel-vault dome. 5 days.

Aerial view of the completed 24,000 sq ft 2nd Street Plaza retail center tan silicone recoating in Prescott Arizona
Retail Center · Prescott, AZ · July 2026

24,000 SF Retail Center — Silicone Recoating over BUR, Prescott AZ

24,000 sq ft TRI-BUILT Roof X-Tender 985 (Tan) 10-yr Warranty

An aging built-up roof on a busy Prescott retail center, restored with tan TRI-BUILT Roof X-Tender 985 Super Silicone over the existing BUR — reinforced seams and penetrations, two cross-directional coats, 5 days on site, zero tenant disruption.

Aerial view of completed Lofts on Fillmore HOA condo roof restoration in downtown Phoenix
HOA Condo · Downtown Phoenix, AZ

Lofts on Fillmore — 20-Unit Condo HOA Roof Restoration

7,000 sq ft ArmorShield 2500 + AC100 10-yr Warranty

A 3-story, 20-unit condominium HOA in downtown Phoenix. Pre-built AC platforms, 2 passes of ArmorShield 2500 foam, 2 coats of ARMORCOAT AC100 white elastomeric, plus PDI-coated detached garages — 4 days, 4-man crew.

Aerial view of completed 38,000 sq ft strip mall foam roof restoration in Glendale Arizona
Retail Center · Glendale, AZ

38,000 Sq Ft Strip Mall Foam Roof Restoration

38,000 sq ft ARMORCOAT AC100 10-yr Warranty

A 20-year-old foam roof at 51st Ave & Thunderbird, cleaned of a full dump trailer of abandoned equipment, repaired, and restored with 2 coats of ARMORCOAT AC100 white elastomeric.

Coming Soon

More Projects On the Way

Industrial warehouse coatings, TPO retrofits, medical office restorations, and more case studies launching through 2026.

Want your commercial roof to be our next case study?

Free inspection. Honest assessment. Real work, real photos, real warranty.

Who we serve

Arizona Commercial Roofing Specialists

Serving the Phoenix metro — Phoenix, Scottsdale, Mesa, Tempe, Chandler, Gilbert, Glendale, Peoria.